What Is CISPR 25? Preparing for Automotive EMC Testing
CISPR 25 testing, which makes sure in-vehicle electronics don't disturb the radio, GPS and other receivers, and the chamber it requires.
What electromagnetic compatibility testing is, which products are subject to it and what failing costs you.
A Wi-Fi connection dropping while the microwave is running in the kitchen, crackling from a speaker when the phone rings, or a device that restarts the moment a motor starts. All of these are everyday examples of electronic devices affecting each other electromagnetically. As the number and density of electronic devices have grown, keeping these interactions under control has become a necessity.
EMC tests are carried out to prove that a product neither disturbs its surroundings nor is affected by them. In this article we explain what electromagnetic compatibility means, which tests are performed, which products are subject to which standards, the cost of failing a test and how to prepare for the process.
Electromagnetic compatibility (EMC) is the ability of a device to work properly in its electromagnetic environment without disturbing other devices around it and without being affected by them. This definition contains a two-way requirement. The first is emission: the electromagnetic noise the device emits must stay below certain limits. The second is immunity: the device must keep working without problems against outside noise up to a certain level.
Emission and immunity are each evaluated separately for paths radiated through the air and conducted along cables. This gives four basic test groups: radiated emission, conducted emission, radiated immunity and conducted immunity. For a product to be considered EMC compliant, it must pass all the tests defined in the standard that applies to it.
In a typical EMC test programme, on the emission side, the noise a product radiates into the air is measured with antennas in a semi-anechoic chamber, and the noise it feeds back into the mains through its supply cables is measured with line impedance stabilisation networks. For products connected to the mains, harmonic currents and voltage fluctuations (flicker) are also evaluated.
On the immunity side, the product is subjected to tests representing events it may encounter in real life. Most of these tests are defined in the IEC 61000-4 series, and each represents a different event. We cover the tests one by one in our related articles; for example, our articles on the ESD test and radiated immunity test are good starting points.
Most electrical and electronic products sold in the European Union and Turkey must meet EMC requirements under the EMC Directive (2014/30/EU) or, for wireless products, the Radio Equipment Directive (2014/53/EU). When these requirements are met, the product can be placed on the market with the CE mark. For the US market, FCC rules apply, and for other markets local regulations.
In sectors such as automotive, medical, aviation and defence, products are subject to sector-specific and usually stricter standards. The best known are CISPR 25 for vehicle electronics, IEC 60601-1-2 for medical devices, MIL-STD-461 for military equipment and RTCA DO-160 for aviation equipment. We explain the European regulatory framework in our article on the EMC Directive.
EMC standards can be grouped into three categories. Basic standards, such as the IEC 61000-4 series, define test methods. Product and product family standards specify which tests are applied at which levels to a particular product group; for example CISPR 32 and CISPR 35 for multimedia products. For products without a specific product standard, generic standards are used.
Generic standards are divided into two according to the environment: IEC 61000-6-1 and 6-3 for residential, commercial and light industrial environments, and IEC 61000-6-2 and 6-4 for industrial environments. Determining the right standard is the first and most important step in a test programme. Tests against the wrong standard either put unnecessary strain on the product or bring it to market with insufficient evidence.
A product that fails an EMC test goes back to design. The board is redesigned, new prototypes are made, the tests are repeated, and in the process the market launch slips by weeks or sometimes months. A failure at a stage when tooling, materials and the supply chain are already ready for mass production creates serious direct and indirect costs.
This is why manufacturers are increasingly building in-house pre-compliance infrastructure. Pre-testing makes it possible to catch problems at the design stage and to visit the certification laboratory only once. We explain the most common reasons products fail in our article on reasons for failing EMC tests, and pre-compliance infrastructure in our article on the pre-compliance room.
A successful EMC test starts with a good test plan. The plan clearly defines the standards to be applied to the product, the tests and levels, the product's operating modes during the test, the functions to be monitored and the acceptance criteria. Sharing this plan with the test laboratory in advance removes uncertainties that could arise on test day.
The sample prepared for testing must represent the mass-production product. Cables, accessories and software version must be the same as the product will be used in the market. In case a problem arises in the test, a spare sample and quick-fix materials such as filter components and ferrites should also be on hand. We explain test plan preparation in detail in our article on how to prepare an EMC test plan.
Certification tests are usually carried out in an accredited laboratory. When choosing a laboratory, check whether its accreditation scope includes the standards that apply to your product, as well as its experience and booking times. For overseas markets, tests should be carried out in laboratories accepted by the relevant market.
For manufacturers who develop products often and have many tests done, building their own test infrastructure gives an important long-term advantage. This infrastructure can start with a compact pre-compliance room and grow over time into a semi-anechoic chamber that can be accredited. For our test infrastructure options, see our semi-anechoic chamber and SAC-3 EMC chamber pages.
Depending on the product's complexity and the number of tests to be applied, it can take from a few days to a week.
For most electrical and electronic products, yes. Simple passive products that neither generate electromagnetic noise nor are affected by it may be exempt.
The source of the problem is found with pre-testing, the design is corrected and the relevant tests are repeated. Detailed measurement data from the laboratory is very useful in this process.
No. For the CE mark, all directives that apply to the product must be met, for example electrical safety and, for wireless products, radio requirements.
Emission tests measure the noise a product emits into its surroundings. Immunity tests evaluate how well the product keeps working against noise coming from outside.
For manufacturers who develop products often and have many tests done, yes. Infrastructure starting with pre-testing significantly reduces test costs and time to market.
Your free site survey and quote will be ready within 24 hours.
CISPR 25 testing, which makes sure in-vehicle electronics don't disturb the radio, GPS and other receivers, and the chamber it requires.
The benefits of a compact pre-compliance chamber that catches problems before certification testing.
Screens, keyboards and cables emit signals unintentionally. What TEMPEST protection is and which organizations need it.