EMC Testing

Pre-Compliance Chamber: Fast EMC Checks for R&D Teams

The benefits of a compact pre-compliance chamber that catches problems before certification testing.

When a product fails its EMC certification test the first time, it usually costs far more than the laboratory fee. The design is reopened, boards are remanufactured, a new test slot has to be waited for and the market launch slips by weeks. What is more, the problem often comes from a small decision made months before test day, at the schematic or board layout stage.

A pre-compliance room lets the R&D team see these problems right next to their own desk, before going to the certification test. In this article we explain what pre-testing shows and what it does not, what kind of room and equipment it requires, how the budget can be planned and what to watch out for when interpreting pre-test results.

What Is Pre-Testing For?

Pre-testing is the general name for measurements that aim to predict how a product will do in its formal EMC tests. The aim is not to give a definitive compliance decision, but to see early how close the product is to the limits and at which frequency and from which interface a problem comes. When an emission peak is found while the board is still a prototype, the fix is often as simple as changing the value of a filter component or correcting a cable route.

The biggest benefit of pre-testing is that it reduces the number of repeat tests. Every day spent in an accredited laboratory, together with travel, sample preparation and engineering time, is a serious cost. Taking the product to the certification test already knowing its results reduces this cost considerably. We have collected the points where tests most often fail in our article on reasons for failing EMC tests.

Pre-Testing Versus Certification Testing

Certification testing is done in an accredited laboratory with the measurement distance, room validation and calibrated equipment described by the standard. For example, radiated emission measurements are made in semi-anechoic chambers documented by validations such as normalised site attenuation (NSA). In pre-testing, not all of these conditions have to be met; the measurement can be made at a shorter distance, in a smaller room or inside a shielded enclosure.

This difference means pre-test results should be used as a comparison tool rather than as absolute values. Seeing that a design change reduced emissions by 6 dB is often more valuable than knowing exactly how far the result is from the limit. That is why the pre-test setup should be kept as constant as possible and different versions of the same product measured under the same conditions.

What Kind of Room Is Needed?

A pre-compliance room is chosen according to the size of the products to be measured and the tests to be performed. For small electronic boards and modules, a shielded enclosure with absorbers or a GTEM cell is often enough. For larger products, or when measurements are wanted in a setup close to a 3-metre distance, a compact semi-anechoic chamber is preferred. These rooms take up much less space than full-scale test chambers and can fit into a standard laboratory area.

Installing the room close to the R&D laboratory noticeably speeds up the development cycle. When an engineer can take a board from the soldering bench and measure it within minutes, several trials can be made on the same day. We describe room options in detail on our SAC-3 EMC chamber page, and the GTEM cell, a compact alternative, in our article what is a GTEM cell.

Which Equipment to Start With?

The quality of pre-testing depends more on the measurement chain than on the room. A LISN and spectrum analyser for conducted emissions, an antenna and preamplifier in the right frequency range for radiated emissions, and near-field probes to find the source of a problem make up the basic equipment. On the immunity side, an ESD gun and an EFT/surge generator let you try in-house the tests products most often fail.

When buying equipment, priority should go to the tests your products struggle with most. For products containing switch-mode power supplies, a conducted emission setup may be the first investment; for products with wireless modules, a radiated emission setup. We discuss in detail which equipment can be bought first in our article on pre-compliance equipment.

Budget and Scalable Planning

Pre-compliance infrastructure does not have to be built all at once. Shielded rooms made of modular panels can be built with a small volume at first and expanded as needs grow. Likewise, components such as absorber lining, a turntable or an antenna mast can be added as the measurement needs become clearer. This approach lets the investment pay off from the first day and spreads the budget over several years.

Various support programmes can be used for this kind of infrastructure investment by universities, technoparks and R&D centres. In the application, it should be clearly defined which tests the room will cover, which projects it will be used in and whether it may later be upgraded for accreditation. We have collected the factors that affect the budget in our article what determines the price of a shielded room.

Interpreting Results Correctly

A safety margin should always be left when interpreting pre-test results. Because there are differences between the pre-test environment and the accredited laboratory in the room, distance, antenna and cable layout, a peak that appears just below the limit in pre-testing may exceed the limit in the certification test. In practice, many teams set a target of staying a few dB below the limit in pre-testing.

Comparative measurement is another way to make results more reliable. When you measure a reference product that has been measured in an accredited laboratory on your own pre-test setup as well, you can see roughly the difference between the two environments. Once this difference is known, the pre-test results of later products become much more meaningful.

Can a Pre-Compliance Room Be Accredited?

A room built for pre-testing can also be used for accredited measurements later if it is designed correctly from the start. For this, the room dimensions must suit the measurement distance required by the relevant standard, and the absorber performance must be chosen to pass NSA and field uniformity validations in the target frequency range. Meeting these requirements with later modifications is usually more expensive.

So when planning a pre-compliance room, it is worth asking what the organisation will want to do five years from now. If only internal use is intended, a compact solution is enough; if the aim is to serve outside customers or to perform formal tests of its own products, the scale of the room and its validation requirements should be set accordingly from the beginning. You can find our solutions for electronics manufacturers on our electronics manufacturing page.

Frequently Asked Questions

Can a pre-compliance room replace the certification test?

No. Pre-test results cannot be used for formal compliance, but they find problems in advance and noticeably raise the chance of passing the certification test the first time.

How much space does a pre-compliance room need?

Compact shielded enclosures and small semi-anechoic chambers fit into a standard laboratory. The exact size depends on the product size to be measured and the target measurement distance.

How far below the limit should pre-test results be?

Because of the differences between the pre-test environment and an accredited laboratory, a safety margin of a few dB is recommended. This margin can be set more accurately by comparing your own setup with a reference product.

What equipment should be bought first?

It depends on the test your products struggle with most. For most teams, near-field probes, a spectrum analyser and a LISN for conducted emissions are a good start.

Can a pre-compliance room be accredited later?

Yes, if the room was designed from the start with the right dimensions and absorber performance to meet validation requirements. Meeting these requirements with later modifications is usually more costly.

Let's Find the Right Solution for Your Project

Your free site survey and quote will be ready within 24 hours.

Get a Quote

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size