Shielding Effectiveness Testing

We measure and report how well your shielded room blocks signals using EN 50147-1, IEEE 299 or MIL-STD-285 methods.

  • Point-by-point measurement at doors, filters and penetrations
  • Signed report following the standard method
  • Recommended fixes for problem points
  • EN 50147-1Test method
  • ReportedSigned result
  • DiagnosisWeak point detection
Get a Quote for Shielding TestingA tailored quote and site survey appointment within 24 hours

or message us on WhatsApp

What is shielding testing?

Does Your Room Really Work?

A shielded room's performance can only be known by measuring it. Worn gaskets, cables added later or faulty installation lower performance without anyone noticing.

We measure at different frequencies with antennas placed inside and outside the room, check critical points such as the door and penetrations one by one, and deliver the result in a signed report.

Standard Method

Measured with an international method.

Weak Point

The leak is located.

Signed Report

A document for audits and tenders.

Recommended Fix

The fix is planned.

Options

Three Options for Your Needs

Let Us Help You Choose

Acceptance Testing

Handover testing of a new room.

Periodic Testing

Annual performance check and reporting.

Fault Finding

Locating the leak point.

Technical specifications

Typical Technical Values

Values are defined per project. We give the exact figures in writing in the quote after the site survey.

MethodsEN 50147-1, IEEE 299, MIL-STD-285
Frequency rangeFrom magnetic fields up to GHz
Measurement pointsDoor, filters, penetrations, joints
OutputSigned test report
Room typesAll brands and types
Process

From First Meeting to Handover

  1. 1

    Free Site Survey

    We listen to your needs, inspect the site and measure the signals.

  2. 2

    Design and Quote

    We define the size and equipment and give you a firm quote.

  3. 3

    Manufacturing and Installation

    We manufacture the parts, build the room and connect the services.

  4. 4

    Testing and Handover

    We test the room to the standard and deliver it with a report.

Frequently asked questions

Frequently Asked Questions About Shielding Testing

If your question isn't answered here, ask our engineer directly.

PhoneWhatsApp

Which method should be used?

The method specified in the contract or specification is used. If none is specified, EN 50147-1 or IEEE 299 is recommended.

Can you test a room built by another company?

Yes. We test and report regardless of brand or type.

How long does testing take?

Depending on room size and the number of measurement points, it is usually completed within one working day.

What happens if the result is poor?

We report the leak point and offer a solution and quote for repair or renewal.

Shielding testing

Free Site Survey for Shielding Testing

Tell us briefly what you need; your site survey and quote will be ready within 24 hours.

Related Solutions

All Solutions

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size