Since 2011 · Installation worldwide

We Build Secure Rooms No Outside Signal Can Enter.

We deliver cyber security rooms, Faraday cages and electronic device test chambers anywhere in the world, from design to installation. Before handover we measure how well the room blocks signals and give you the result in a report.

  • Site survey and preliminary design free of charge
  • Test report on delivery
  • Turnkey installation
Signal Blocking MeasurementSample Acceptance Report
Magnetic · 10 kHz78 dB18 dB above the limit
Electric · 1 MHz118 dB18 dB above the limit
Plane Wave · 1 GHz110 dB10 dB above the limit
408012010 kHz1 MHz100 MHz10 GHz
MeasuredSpecification Limit
EN 50147-1IEEE 299NATO SDIP-27MIL-STD-285
2011in the field since
194+completed room projects
14countries with installations
%100delivered with a test report
Standards we work to
EN 50147-1Shielding Effectiveness Testing
MIL-STD-461Military EMC
CISPR 25Automotive EMC
NATO SDIP-27TEMPEST
Room finder

Find the Right Room in 30 Seconds

Answer two questions and instantly see the recommended room type, standard and approximate size.

1What will you use it for?
2How big is the largest device?
Our recommendation

Shielded Cabin

The fastest-to-install solution for a single examination station.

EN 50147-1≥ 100 dB
Projects

Completed Projects and Measurement Results.

Public SafetyCyber security room

4-Station Digital Forensics Laboratory with Shielded Entrance

110 dBsignal attenuation (1 GHz)
9 weeksfrom survey to handover
Defense IndustryMIL-STD-461 chamber

Heavy-Floor MIL-STD-461 Test Chamber for the Defense Industry

40 GHzupper frequency
20 tonsturntable load
Electronics ManufacturingSAC-3

3 m Semi-Anechoic Test Chamber for an Electronics Manufacturer

±4 dBmeasurement accuracy (standard-compliant)
%60lower external lab costs
BankingShielded cabin

2-Station Shielded Cabin for a Bank's Fraud Unit

100 dBsignal attenuation
3 dayson-site assembly
University HospitalEEG room

EEG Room for a University Hospital Neurology Clinic

50 Hzmains noise suppressed
2measurement stations
Defense IndustryTEMPEST

TEMPEST Room for Classified Meetings and Encrypted Communications

SDIP-27level A
12 m²usable area
Process

From First Meeting to Handover, Step by Step.

Book a Site Survey
  1. 1

    Survey

    We inspect your building on site and measure the signals in the environment.

  2. 2

    Design

    We define the room's size and layout and draw its 3D design.

  3. 3

    Manufacturing

    We manufacture the wall panels, special door and filters in our workshop.

  4. 4

    Installation

    We install the room on site and connect power and ventilation.

  5. 5

    Testing and Handover

    We measure how well the room blocks signals and deliver it with a report.

  6. 6

    Maintenance

    We measure regularly, replace worn parts and maintain performance.

Free site survey

We Build Your Room, Test It and Hand It Over.

Tell us briefly what you need; your free site survey and quote will be ready within 24 hours.

Frequently asked questions

Frequently Asked Questions.

Can't find the answer you need? Ask our engineer directly.

PhoneWhatsApp

What is the difference between a shielded room and an anechoic chamber?

A shielded room (Faraday cage) uses its metal cladding to keep outside signals out and inside signals in. In an anechoic chamber, the walls are additionally covered with special material that absorbs signals, so there are no reflections inside. Certification tests of electronic devices (EMC tests) are performed in anechoic chambers.

Can the room be installed in our existing building?

Yes. The room arrives in parts and can be carried in through standard doors. During the survey we check floor load capacity, ceiling height, power and ventilation; if needed, reinforcement is included in the project.

How long does installation take?

Small enclosures and rooms are delivered in a few weeks; large test chambers in a few months, depending on project size. We state the exact timeline in writing in the quote after the survey.

Which measurements are made at handover?

Before handover we measure how well the room blocks signals according to international standards (EN 50147-1, IEEE 299). Test chambers also undergo calibration tests showing the chamber measures correctly. We deliver all results in a report.

Can you relocate or refurbish our existing room?

Yes. We dismantle your room and reinstall it at its new location. We replace worn parts such as door gaskets and absorbers and deliver the room re-measured.

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size