Test and TEMPEST Rooms for the Defense Industry

From design to handover, we build chambers that prepare your military equipment for MIL-STD-461 tests and protect classified information from leakage.

  • Chamber design suited to MIL-STD-461G and DO-160 test setups
  • TEMPEST rooms for areas processing classified data
  • Independent measurement and reported acceptance at handover
  • MIL-STD-461GSuited to the test setup
  • TEMPEST ProtectionNo classified data leaks
  • EMP ProtectionCritical facility security
Get a Quote for Defense IndustryA tailored quote and site survey appointment within 24 hours

or message us on WhatsApp

Why is it needed?

In a Military Project, the Test Chamber Sets the Schedule.

Before going into the field, a defense product must prove both that it won't disturb other equipment and that it can withstand strong signals. These tests are carried out in special chambers that no outside signal can enter and where internal reflections are absorbed.

Waiting in an external lab's queue can extend the project schedule by months. With your own test chamber you run pre-tests during development and arrive at final testing ready.

In areas processing classified information the risk is different: weak signals emitted by computers and displays can be picked up from outside. TEMPEST rooms cut off this leakage at the room level.

Product Qualification

MIL-STD-461 tests of radar, communication and electronic warfare equipment.

Confidential Meetings and Processing

TEMPEST rooms for command centers and offices that process classified information.

Critical Facility Protection

Protecting command facilities against pulses.

Shielded Space in the Field

Secure workspace in the field with portable shielded containers.

Solutions

Rooms Used in the Defense Industry

MIL-STD-461 Chamber

Shielded, absorber-lined chamber for emission and immunity testing of military equipment.

TEMPEST Room

Room with filtered lines that prevents information leaking from computers and screens.

Standards

Which Standards Do We Build To?

The room is designed to the standard your product or facility must meet; at handover, an independent accredited body tests it against that standard.

  • Your testing and usage needs are defined during the site survey
  • Acceptance testing by an independent body
  • Annual maintenance and re-testing are available
  • MIL-STD-461G

    EMI requirements for subsystems and equipment.

  • MIL-STD-464C

    Electromagnetic environmental effects at system level.

  • NATO SDIP-27 / 28 / 29

    TEMPEST equipment levels, zoning and installation rules.

  • MIL-STD-188-125

    HEMP protection for fixed and transportable facilities.

  • AECTP 500

    NATO electromagnetic environmental test procedures.

  • RTCA DO-160G

    EMC testing of airborne equipment.

Three layers of protection

Three Distinct Needs in Defense Programs

In the defense industry, shielding answers three different needs. The first is product qualification: no system can be delivered until it passes EMC testing under MIL-STD-461. The second is information security: areas where classified information is processed must be protected with TEMPEST measures. The third is protecting critical facilities against EMP and HEMP.

These needs often come together on the same campus, even in the same building. Planning test chambers, secure meeting and processing areas and protected facilities together makes better use of both budget and floor space. Our installations are carried out by authorized staff in line with confidentiality rules.

  • Product qualification

    MIL-STD-461 test chambers.

  • Information security

    TEMPEST rooms and secure zones.

  • Critical facility protection

    EMP / HEMP protected areas.

  • Field use

    Shielded containers and tents.

  • Confidentiality

    Installed by authorized staff.

  • Documentation

    Independent acceptance testing and documents.

Process

From First Meeting to Handover

  1. 1

    Requirements Review

    We assess your testing, security and protection needs together.

  2. 2

    Integrated Design

    We plan test chambers, secure areas and protection as one.

  3. 3

    Confidential Installation

    Authorized staff install under strict confidentiality.

  4. 4

    Validation and Acceptance

    We coordinate independent acceptance testing for every area.

Frequently asked questions

Frequently Asked Questions About the Defense Industry

If your question isn't answered here, ask our engineer directly.

PhoneWhatsApp

How is chamber size determined for MIL-STD-461 tests?

The largest device to be tested, antenna distance and test table layout are assessed together. During the survey we take your equipment list and calculate the required internal size accordingly.

What is the difference between a TEMPEST room and a normal shielded room?

Both are signal-proof. In a TEMPEST room, power, data and ventilation lines are additionally fitted with special filters so information inside can't leak out through them, and zones are separated.

Can it be installed in an existing building?

Yes. The rooms consist of modular panels; the building's load capacity and door dimensions are checked during the survey.

What documents are provided at handover?

The room is tested to the relevant standard by an independent accredited body and delivered with the test report, bill of materials and maintenance instructions.

Can a test chamber and a TEMPEST room share a building?

Yes. With proper zoning and line separation, test chambers and classified processing areas can safely sit in the same building. We plan the layout with you at the start of design.

Are there shielded solutions for field use?

Yes. Shielded containers and transportable shielded structures provide secure working and communication space in field operations.

How is confidentiality maintained during installation?

Installation is carried out by authorized staff in line with the program's confidentiality requirements and your organization's security rules.

Defense Industry

Free Site Survey for Your Defense Industry Project

Share your program's testing, security and protection needs, within your confidentiality rules; your survey and quote will be ready within 24 hours.

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size