MIL-STD-461 Chamber
Shielded, absorber-lined chamber for emission and immunity testing of military equipment.
From design to handover, we build chambers that prepare your military equipment for MIL-STD-461 tests and protect classified information from leakage.
Before going into the field, a defense product must prove both that it won't disturb other equipment and that it can withstand strong signals. These tests are carried out in special chambers that no outside signal can enter and where internal reflections are absorbed.
Waiting in an external lab's queue can extend the project schedule by months. With your own test chamber you run pre-tests during development and arrive at final testing ready.
In areas processing classified information the risk is different: weak signals emitted by computers and displays can be picked up from outside. TEMPEST rooms cut off this leakage at the room level.
MIL-STD-461 tests of radar, communication and electronic warfare equipment.
TEMPEST rooms for command centers and offices that process classified information.
Protecting command facilities against pulses.
Secure workspace in the field with portable shielded containers.
Shielded, absorber-lined chamber for emission and immunity testing of military equipment.
Room with filtered lines that prevents information leaking from computers and screens.
Room that protects critical systems against electromagnetic pulses.
The room is designed to the standard your product or facility must meet; at handover, an independent accredited body tests it against that standard.
EMI requirements for subsystems and equipment.
Electromagnetic environmental effects at system level.
TEMPEST equipment levels, zoning and installation rules.
HEMP protection for fixed and transportable facilities.
NATO electromagnetic environmental test procedures.
EMC testing of airborne equipment.
In the defense industry, shielding answers three different needs. The first is product qualification: no system can be delivered until it passes EMC testing under MIL-STD-461. The second is information security: areas where classified information is processed must be protected with TEMPEST measures. The third is protecting critical facilities against EMP and HEMP.
These needs often come together on the same campus, even in the same building. Planning test chambers, secure meeting and processing areas and protected facilities together makes better use of both budget and floor space. Our installations are carried out by authorized staff in line with confidentiality rules.
MIL-STD-461 test chambers.
TEMPEST rooms and secure zones.
EMP / HEMP protected areas.
Shielded containers and tents.
Installed by authorized staff.
Independent acceptance testing and documents.
We assess your testing, security and protection needs together.
We plan test chambers, secure areas and protection as one.
Authorized staff install under strict confidentiality.
We coordinate independent acceptance testing for every area.
If your question isn't answered here, ask our engineer directly.
The largest device to be tested, antenna distance and test table layout are assessed together. During the survey we take your equipment list and calculate the required internal size accordingly.
Both are signal-proof. In a TEMPEST room, power, data and ventilation lines are additionally fitted with special filters so information inside can't leak out through them, and zones are separated.
Yes. The rooms consist of modular panels; the building's load capacity and door dimensions are checked during the survey.
The room is tested to the relevant standard by an independent accredited body and delivered with the test report, bill of materials and maintenance instructions.
Yes. With proper zoning and line separation, test chambers and classified processing areas can safely sit in the same building. We plan the layout with you at the start of design.
Yes. Shielded containers and transportable shielded structures provide secure working and communication space in field operations.
Installation is carried out by authorized staff in line with the program's confidentiality requirements and your organization's security rules.
Share your program's testing, security and protection needs, within your confidentiality rules; your survey and quote will be ready within 24 hours.