In-Building Relocation
Relocation within the same building.
We dismantle your existing shielded room, anechoic chamber or antenna chamber, move it to its new site and reinstall it.
Shielded rooms are modular, but gaskets, joints and penetrations can be damaged in a move. A badly done relocation permanently lowers the room's performance.
We first measure the room, dismantle it with numbered parts, transport it safely and install it at the new site. Worn gaskets are renewed and acceptance testing is carried out by an independent body.
The condition before the move is recorded.
Parts are numbered and packed.
Worn gaskets are replaced.
Independently tested at the new site.
Relocation within the same building.
Dismantling, shipping and installation at a new facility.
Customs and logistics included.
Values are defined per project. We give the exact figures in writing in the quote after the site survey.
Industries where it is used
| Scope | Dismantling, packing, transport, installation |
|---|---|
| Room types | Shielded, anechoic, cyber, TEMPEST |
| Renewal | Gasket, filter and lock replacement |
| Testing | Before and after the move |
| Region | Worldwide |
Shielded and anechoic rooms can be dismantled and rebuilt, but if it's done wrong, the room won't perform as it did at its new site. The problems we see most are panels removed without numbering, damaged mating surfaces, reused worn gaskets, broken absorbers and uneven floors in the new building.
Before the move, we measure the room and record its current performance. We number every part, pack it in protective packaging and check the new building before installation. During reassembly we replace worn gaskets and filters; an independent accredited body then carries out acceptance testing, so before-and-after performance can be compared on paper.
Current performance on record.
Every panel goes back in place.
Mating surfaces and absorbers protected.
Floor and dimensions verified in advance.
Worn parts replaced.
Independently tested and compared.
We run the pre-move check to the standard that fits the room type; post-move acceptance testing is done by an independent body and compared with it.
Shielding effectiveness of shielded rooms.
NSA and SVSWR validation of anechoic EMC chambers.
System validation of antenna measurement chambers.
Test specification for high-security shielded rooms.
Re-validation records for accredited laboratories after a move.
Every chamber type has its own critical points in a move. We build the plan around your chamber and the conditions at the new site.
SAC-3, SAC-5 and SAC-10 chambers
OTA and broadband measurement rooms
Far-field, near-field and compact range
Chambers with ground-plane test benches
An antenna measurement range is only as good as its alignment. The compact-range reflector, near-field scanner and positioner all have to return to the same geometry at the new site; otherwise the patterns you measure will no longer match your reference data.
We crate reflectors so nothing ever touches the surface and remove phase-stable RF cables without exceeding their bend radius. At the new site we re-level and re-align positioners and scanners, then check the quiet zone and the full measurement chain with a standard gain horn before the range goes back into service.
Crated so the surface is never touched.
Planarity re-set at the new site.
Axes re-aligned, reference points re-taken.
Removed and shipped within their bend radius.
Reflectivity measured again.
System verified with a standard gain horn.
We test the room and survey both sites.
We number every part and pack it securely.
We move the room and rebuild it at the new site.
We coordinate independent acceptance testing and compare the results.
If your question isn't answered here, ask our engineer directly.
Yes. During the survey we examine the room's construction and determine whether it can be moved and what renewal is needed.
With correct dismantling and gasket renewal the room returns to its original performance; independent acceptance testing proves it.
Thanks to the modular construction, a size change can be planned during relocation.
It depends on room size and distance; we give a work schedule after the survey.
Floor flatness and load capacity, ceiling height, entrance dimensions, and power and HVAC provisions should all be checked in advance. We give you a building preparation checklist.
Yes. We relocate rooms worldwide, handling packing, logistics planning, installation and testing in the new country as a single service.
Yes. A move is a good opportunity to renew gaskets, filters and locks, add penetrations or enlarge the room; this work can be done during reinstallation.
Sound absorbers are reused. Because some ferrite tiles crack during removal and older foam absorbers deteriorate over time, we identify which ones need replacing during the survey.
Yes. A move changes the chamber's geometry and ground-plane bonding. The chamber shouldn't be used as a test site until NSA, SVSWR and shielding measurements have been repeated. These validation measurements are carried out by an independent accredited body.
Tell us the room type and its current and new locations; your survey and quote will be ready within 24 hours.
Keep your room performing as on day one.
We measure performance and report it.
Revision, modification and renewal of your chamber.