Anechoic Chamber Relocation
We move your chamber and prove it with measurements.
We adapt your existing anechoic chamber to new standards, higher frequencies and bigger products without tearing it down. Every change is handed over with re-validation measurements.
The steel shell of an anechoic chamber lasts for decades. What ages or falls short is usually the absorber lining, the equipment and the frequency range the chamber was originally built for.
Your product range may have changed, the frequencies you need to test may have gone up, or a new standard may be on the horizon. Foam absorbers collect dust, sag and lose performance over the years. In most of these cases, upgrading the chamber you already have is both faster and cheaper than building a new one.
We start by measuring your chamber and documenting where it stands today. Then we put together an upgrade plan showing what each change will deliver against your goals. Once the work is done, we validate the chamber again and hand over the results in a report.
The chamber is measured and documented.
The gain from each option is shown.
A work plan that keeps downtime low.
Results proven by measurement.
We replace worn foam absorbers and cracked ferrite tiles to bring reflection performance back.
Hybrid absorbers plus the right antennas, cables and preamplifiers take your chamber to higher frequencies.
Floor absorbers let your semi-anechoic chamber handle above-1 GHz and fully anechoic measurements.
We raise load ratings for heavier products, replace ageing drives and connect automation to your test software.
Wider doors for bigger products, plus high-current filters and new fiber and coaxial penetrations.
Low-noise lighting, camera systems and a new control or amplifier room.
Many EMC chambers were built to measure up to 1 GHz or 6 GHz. Wireless interfaces, high-speed digital electronics and newer standards now push testing much higher, and above 1 GHz CISPR 16-1-4 requires the test site to be validated with the SVSWR method.
Absorbers decide how high a chamber can go. In chambers lined only with ferrite tiles, adding hybrid absorbers in front of the tiles lifts high-frequency performance, and absorbers placed on the floor in front of the test volume improve SVSWR. Where needed, we also specify antennas, preamplifiers and cable sets for the new range.
Added in front of ferrite tiles for high frequencies.
Improve SVSWR above 1 GHz.
A measurement chain matched to the new range.
1–18 GHz to CISPR 16-1-4.
Re-measured after new penetrations.
Correction factors updated.
Anechoic chambers rarely fail overnight; performance slips gradually. Spotting the signs early lets you act before you get a test result you can't accept.
If one or more of the points below sounds familiar, let's measure your chamber and work out together which upgrade will pay back the most. For ageing chambers, our periodic maintenance service helps keep performance where it should be.
Validation results are creeping toward tolerance.
Crushed, faded or crumbling absorbers.
The turntable, door or test volume no longer fits.
Higher frequencies or a different method required.
Some tests still have to go to an outside lab.
Drives and controllers with no spare parts left.
Scope depends on your chamber's condition and your goals. We confirm it in writing in the quote after measurement and survey.
Industries where it is used
| Scope | Absorbers, equipment, doors, penetrations, controls |
|---|---|
| Frequency range | 30 MHz – 18 GHz, 40 GHz optional |
| Validation | Shielding, NSA, SVSWR, field uniformity |
| Chamber types | Any make or model |
| Scheduling | Phased around your test calendar |
| Documentation | Before and after test report |
We measure your chamber and inspect absorbers and equipment.
We show the gain and cost of each option.
We phase the work to keep downtime low.
We repeat the measurements and report the results.
If your question isn't answered here, ask our engineer directly.
If the shell and shielding are sound, modification is usually faster and more economical. If the shell has widespread corrosion or the chamber is far too small for your new needs, a new chamber may be the better call. After measuring, we present both options side by side.
Yes. We inspect the panel system, absorbers and equipment during the survey and work with solutions that are compatible with your chamber.
It depends on the scope. We split the work into phases and plan it around your test calendar to keep downtime to a minimum.
Not always. Adding hybrid absorbers in front of existing ferrite tiles and placing floor absorbers in front of the test volume is often enough.
Yes. Depending on the scope, we repeat shielding, NSA, SVSWR and field uniformity measurements and hand over the results in a report.
Changes that affect the site validation require re-validation. We report the measurements in a form you can use directly in your accreditation file.
There's no fixed interval; it depends on usage, environmental conditions and absorber type. Periodic validation measurements and visual inspection are the most reliable way to tell when it's time.
Tell us about your chamber and what you want it to do; your survey and quote will be ready within 24 hours.
We move your chamber and prove it with measurements.
Periodic maintenance for shielded rooms.
For CE and certification testing.