Test Cell
Cell for component testing.
We build shielded high-voltage laboratories to accurately measure weak signals such as partial discharge in cable, transformer and insulator testing.
Partial discharge signals measured in high-voltage tests are very weak. Outside radio signals and mains noise can make these measurements impossible.
A shielded laboratory cuts out outside noise; grounding, safety clearances and doors for large equipment are custom-designed for the project.
Weak signals are measured accurately.
Outside signals don't enter the lab.
Grounding and clearances are planned.
Heavy equipment gets in easily.
Cell for component testing.
For transformer and cable testing.
Shielded control area for measurement.
Values are defined per project. We give the exact figures in writing in the quote after the site survey.
Industries where it is used
| Application | Partial discharge, withstand voltage tests |
|---|---|
| Shielding | Per project, focused on low noise |
| Grounding | Dedicated grounding system |
| Door | Large, sliding or folding |
| Reference | IEC 60060, IEC 60270 |
Partial discharges are tiny breakdowns at small flaws in insulation, measured in picocoulombs (pC). They give the earliest warning about the life of transformers, cables and switchgear. But signals this small are easily masked by radio broadcasts, nearby motor drives, welding equipment and noise on the mains.
Under IEC 60270, background noise must stay below the partial discharge level you need to measure. To get there, the lab hall is shielded, power entries are filtered and grounding is brought to a single reference point. We also plan the clearances and safety measures that high voltage demands right from the start.
For sensitive pC measurements.
Blocks radio and industrial noise.
Mains noise suppressed.
No ground loops.
Planned for the test voltage.
Interlocked doors and warning systems.
We design the laboratory around the standards for your tests and the product groups you work with.
High-voltage test techniques: general definitions and requirements.
Partial discharge measurements.
Insulation levels and dielectric tests for power transformers.
High-voltage switchgear and controlgear.
Measuring the shielding effectiveness of the lab hall.
We define the test voltage, product size and target noise level.
We plan shielding, clearances, grounding and doors.
We build the shielded hall, filters and grounding system.
We coordinate independent testing of shielding and background noise.
If your question isn't answered here, ask our engineer directly.
Partial discharge measurements are very sensitive; outside noise spoils them. Shielding cuts this noise out.
Test voltage, equipment size and safety clearances are assessed together.
In most cases, yes. Building height and floor are inspected during the survey.
We plan a grounding system compatible with the shielding as part of the project.
Under IEC 60270, background noise must stay below the partial discharge level you need to measure. We set the target level with you based on the products you'll test.
Clearances are planned for the test voltage, and door interlocks, emergency stops, warning lights and the grounding layout are all part of the design.
Yes. As well as blocking outside noise, the shielded hall reduces the effect of fields generated during testing on nearby systems.
Tell us your test voltage and product groups; your survey and quote will be ready within 24 hours.
Interference-free room for sensitive measurements.
We measure performance and report it.
Protects critical systems against pulses.