ISO 9001 Quality Management
All our processes run according to this system.
We build every room with certified materials, measure it to international standards and deliver it with a report.
At handover, how well the room blocks signals is measured using the methods defined in the standards below. Which standard is used is agreed together in the contract.
Method for measuring the signal blocking level of a shielded room.
US standard for measuring the performance of shielded rooms and enclosures.
Classic shielding measurement method still required in military projects.
Protection requirements against information leakage in TEMPEST rooms.
Validation of EMC test chambers and the measurement environment.
Signed report showing the measurement results.
Manufacturer certificates for panels, doors, filters and gaskets.
All drawings in their as-built form.
Warranty scope and duration for the room and its components.
Step-by-step guide to door gasket, filter and lock maintenance.
Record of the user training given to your team.
Drawings pass engineering approval according to intended use and standard.
Panels, doors and filters are checked one by one after production.
Every joint and penetration point is checked during installation.
The room is measured under the supervision of you or an independent body.
Let's list together the documents your tender file needs.
Yes. Your team or an independent body of your choice can attend the measurement; measurement points and frequencies are agreed together in advance.
Yes. We prepare a technical specification compliance table, company documents and a list of similar work to fit your tender schedule.
Door gaskets and filters can wear depending on frequency of use. With annual measurement and maintenance, the room is kept at its day-one level.
The report can be prepared in Turkish and English; an Arabic summary is added if needed.
Send your specification; your compliance table and quote will be ready within 24 hours.