Pre-Compliance Chamber
Quick check room before certification.
We build budget-friendly shielded rooms and pre-test chambers for research, teaching and product development.
In laboratories making sensitive measurements, signals from campus Wi-Fi, phones and other devices can spoil results. A shielded room cuts out this interference and makes measurements repeatable.
For R&D centers, a pre-test chamber shows in advance whether a product will pass certification testing. When a problem is found early, the fix is cheap too.
In line with project budgets, we recommend modular structures that start from a small Faraday cage and can grow as needs increase.
Hands-on training in electronics and communications courses.
Sensitive measurement in physics, biomedical and materials research.
Finding problems early, before certification.
Development testing of new circuits and devices.
Quick check room before certification.
Shielded cage for measurement and teaching.
The room is designed to the standard your product or facility must meet; at handover, an independent accredited body tests it against that standard.
Shielding effectiveness of shielded rooms and cages.
Emission measurements on electronic equipment.
Emission and immunity testing in TEM waveguides (GTEM).
Radiated RF immunity testing.
Competence requirements for labs serving industry.
Universities and research centers usually start with a limited budget, but their needs grow over time. What's bought for a teaching lab today may become the backbone of a research project or industry partnership tomorrow. That's why the first investment should leave room to grow.
A GTEM cell or Faraday cage suits small products and teaching, a pre-compliance chamber suits product development, and a SAC-3 is a strong starting point for advanced research and industry services. The modular build means the room can be enlarged or moved to a new building later. We also help prepare technical specifications and quotes for grant applications.
Hands-on EMC for students.
Compact testing for small products.
A noise-free measurement environment.
Quick checks in a pre-compliance chamber.
Modular build expands later.
Specifications and quotes for applications.
We define your teaching, research and industry needs.
We plan for today's budget and tomorrow's growth.
We install the room and train faculty and technicians.
We coordinate independent acceptance testing and hand over the report.
If your question isn't answered here, ask our engineer directly.
For most teams, a desktop or small Faraday cage is a good start. Thanks to the modular construction, it can be enlarged later.
Yes. We prepare a technical specification and a detailed quote you can use in funding program applications.
No, but it shows in advance whether the product will pass and reduces the chance of repeating certification.
Modular panels can be dismantled and reinstalled in another building.
For pre-testing emissions and immunity of small products and for teaching, a GTEM cell is an economical, compact option. Larger products need a semi-anechoic chamber.
Yes. With a properly validated chamber and ISO/IEC 17025 accreditation, your lab can offer testing services to industry. We support the infrastructure side of accreditation.
Yes. At handover we provide training on using the room and the test setup.
Tell us what the lab is for and your budget range; your survey and quote will be ready within 24 hours.