EMC Test Chambers for Electronics Manufacturers

Prepare your products for the EMC tests required for CE and export in your own facility, and pass certification the first time.

  • Chamber for EN 55032 and IEC 61000-4-3 tests
  • Pre-test chamber close to the production line
  • Design suited to your test system, with independent acceptance testing
  • CE and ExportEN 55032 tests
  • Pre-TestPass the first time
  • Close to ProductionFast test cycle
Get a Quote for Electronics ManufacturingA tailored quote and site survey appointment within 24 hours

or message us on WhatsApp

Why is it needed?

A Product That Fails Testing Reaches the Market Late.

Every electronic product exported to Europe and many other countries must pass EMC tests for marks such as CE. A product that fails goes back to design, and the launch is delayed.

With your own test chamber you measure frequently during design. You find problems early and go to the certification lab only once.

Depending on your product size, we offer solutions from compact pre-test chambers to semi-anechoic chambers with a 3 m test distance.

Design Validation

Development testing of prototypes.

CE and Export

Full test preparation before certification.

Production Control

Sample testing in series production.

Troubleshooting

Finding and fixing sources of interference.

Solutions

Rooms Used in Electronics Manufacturing

Standards

Which Standards Do We Build To?

The room is designed to the standard your product or facility must meet; at handover, an independent accredited body tests it against that standard.

  • Your testing and usage needs are defined during the site survey
  • Acceptance testing by an independent body
  • Annual maintenance and re-testing are available
  • CISPR 32 / EN 55032

    Emissions from multimedia and IT equipment.

  • CISPR 35 / EN 55035

    Immunity of multimedia equipment.

  • CISPR 11 / EN 55011

    Emissions from industrial, scientific and medical equipment.

  • IEC 61000-4-x

    Immunity test methods: ESD, radiated RF, EFT, surge.

  • FCC Part 15

    Requirements for electronic devices in the US market.

The real cost of testing

The Real Cost of Failing an EMC Test

When a product fails EMC testing at a certification lab, the loss isn't just the test fee. It brings a board redesign, a new prototype, another lab booking and, worst of all, a delayed launch. The later a problem is found, the more it costs to fix.

Your own test chamber breaks that cycle. You measure the effect of every design change straight away, fix problems at the prototype stage and go to the certification lab with a product that passes first time. Based on your product size and target markets, we recommend a pre-compliance chamber, a SAC-3 or a larger chamber.

  • Early detection

    Problems found during design.

  • No booking needed

    Test whenever you want.

  • First-time pass

    Arrive ready for certification.

  • Export markets

    Prepared for CE, FCC and more.

  • Production control

    Sample checks in series production.

  • Scalable chamber

    Grow from pre-compliance to SAC-3.

Process

From First Meeting to Handover

  1. 1

    Product and Market Review

    We define your products, target markets and standards.

  2. 2

    Chamber Selection

    We choose pre-compliance, SAC-3 or larger with you.

  3. 3

    Installation and Training

    We install the chamber and train your team.

  4. 4

    Validation

    We coordinate independent validation to the standard.

Frequently asked questions

Frequently Asked Questions About Electronics Manufacturing

If your question isn't answered here, ask our engineer directly.

PhoneWhatsApp

Should we get a pre-test chamber or a full test chamber?

Your number of products and test frequency decide. If you develop many new products, a 3 m semi-anechoic chamber fits; for fewer tests, a pre-test chamber.

Is a test done in our own chamber valid for certification?

Certification usually requires an accredited laboratory. Your own chamber lets you solve problems beforehand.

Can the chamber be installed in the production area?

Yes. If the floor and space are suitable, installing near the production area shortens test times.

How long does installation take?

Duration depends on chamber type and size. We give a detailed work schedule after the survey.

Which standards apply to which markets?

In Europe, CE marking calls for EN 55032, EN 55035 and the relevant product standards; in the US, FCC Part 15 applies. We pin down the standards for your product type with you during the survey.

Can the chamber be used for both emissions and immunity?

Yes. A semi-anechoic chamber handles emissions testing and, with the right equipment, IEC 61000-4-3 radiated immunity testing as well.

When does our own chamber pay for itself?

It depends on how many external tests you run each year, how often you fail, and what a delayed launch costs you. We can work through the numbers with you during the survey.

Electronics Manufacturing

Free Site Survey for Your Electronics Manufacturing Project

Tell us about your products and target markets; your survey and quote will be ready within 24 hours.

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size