CISPR 25 Automotive Chamber
Absorber-lined chamber for emission and immunity testing of vehicle parts.
Prepare your vehicle electronics for CISPR 25 and ISO 11452 tests in your own facility, without waiting in an external lab's queue.
Hundreds of electronic parts work in a vehicle. None of them may disturb the radio, the GPS or another part, and at the same time they must not be affected by phone and transmitter signals.
With high-voltage batteries and power electronics, electric vehicles have made these tests even more essential. Tests must be repeated for every new part version.
With your own test chamber you run pre-tests during development and go to the certification lab with a product whose problems are already solved.
Emission and immunity testing of control units, displays and sensors.
Chargers, inverters and battery systems.
Testing of the complete vehicle in a large anechoic chamber.
Quick checks and troubleshooting before certification.
Absorber-lined chamber for emission and immunity testing of vehicle parts.
Semi-anechoic chamber with a 10 m test distance for large equipment and vehicles.
The room is designed to the standard your product or facility must meet and is tested against that standard at handover.
Measuring interference emitted by electronic parts inside the vehicle; protects the vehicle's receivers.
Measuring the interference the complete vehicle emits outward.
Testing the immunity of vehicle parts to strong outside signals in a shielded room.
Electromagnetic immunity testing of the complete vehicle.
We listen to your needs, inspect the site and measure the signals in the environment.
We define the room size and equipment and give you a firm quote and schedule.
We manufacture the panels, build the room and connect power and ventilation.
We test the room to the standard and deliver it with a report.
If your question isn't answered here, ask our engineer directly.
Usually not. A compact CISPR 25 chamber is enough for component tests; full-vehicle tests require a much larger chamber with a vehicle turntable.
Without waiting in an external lab's queue, you can test as often as you like during product development. The chance of passing certification on the first attempt increases.
We design the chamber to be compatible with your test equipment; antennas, test table and cable penetrations are planned around your equipment list.
The chamber is measured for signal blocking and internal environment conditions; the results are delivered in a report.
Tell us briefly what you need; your site survey and quote will be ready within 24 hours.