EMC Testing

IEC 61000-4-3: How Radiated Immunity Testing Works

The setup, levels and chamber requirements of IEC 61000-4-3, the test that measures a device's immunity to radio transmitters and mobile phones.

What Does the Test Measure?

In daily life, devices constantly operate inside fields created by radios, mobile phones, Wi-Fi routers and broadcast transmitters. IEC 61000-4-3 measures whether a device keeps working correctly when exposed to such fields.

During the test, an electromagnetic field of a set strength and frequency is applied to the device while its behavior is monitored. A frozen screen, a drifting reading or a lost link is assessed against the performance criterion in the product standard.

Levels and Frequency Range

The field strength used in the test is expressed in volts per meter (V/m). Common levels are 3 V/m for home and office products and 10 V/m for industrial products. Automotive and military standards can demand much higher values.

The frequency range is typically 80 MHz to 6 GHz. The signal is amplitude-modulated with a 1 kHz tone to mimic real transmitters, and the frequency is swept step by step. That's why the test can take several hours per device.

Why Is a Shielded Room Needed?

The field generated in the test is strong enough to disrupt nearby radio and telecom services. The test must therefore be done in a room that leaks no signals outside. Reflections must also be controlled so the field is uniform in front of the device.

These two requirements mean the test must be done in a semi-anechoic chamber or an absorber-lined test chamber. The chamber is validated with a field uniformity measurement to the standard; tests run before it passes aren't accepted.

What to Watch in Pre-Testing

The most common mistake in in-house pre-testing is laying out cables differently from the certification lab. Because cables pick up the field, their length and position directly affect the result.

We can help you define the right test setup and chamber size for your product. Our solutions for electronics manufacturers range from pre-test chambers to full test chambers.

Frequently Asked Questions

What equipment does the test need?

The core equipment is a signal generator, power amplifier, transmitting antenna and field probe. Amplifier power is chosen by the required field strength and test distance.

What is a field uniformity measurement?

It shows the field is distributed evenly enough over the plane where the device will sit. It is repeated at chamber handover and after major changes.

Does failing mean a design flaw?

It can usually be solved with small changes to cabling and grounding. Finding the problem in pre-testing makes the fix much easier.

Let's Find the Right Solution for Your Project

Your free site survey and quote will be ready within 24 hours.

Get a Quote

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size