Shielded Container: A Secure Workspace in the Field
The advantages of a container solution when you need a shielded space that can be moved to site without waiting for a building.
Two shielded rooms may look the same and still be priced very differently. We explain the main cost factors one by one.
The required signal attenuation (dB) and frequency range are the two factors that affect price the most. Higher performance means better panels, doors and filters.
That is why defining the level you actually need avoids unnecessary cost.
As the room grows, panels and labor increase. The door is the most expensive and most critical part of the room; the number of doors, their size and whether they are automatic directly affect cost.
For heavily used rooms, a two-door entry corridor is recommended.
Ventilation, lighting, power and data lines, floor reinforcement and building access conditions add to the total cost.
For an accurate quote, a site survey and a detailed quote listing each item separately are important.
Looking only at the total price when comparing quotes from different companies is misleading. The test method, door type, number of filters, ventilation and handover documents can differ from quote to quote.
The way to make comparison easier is to prepare a clear specification before requesting quotes. Our specification writing guide and modular vs welded comparison help in this process. For a quote, reach us through our contact page.
Partly. Size matters, but performance level, door and equipment affect price at least as much.
No, the survey and preliminary design are free.
Usually within 24 hours if the information is clear; for projects needing a survey, shortly after it.
Related Solutions
Your free site survey and quote will be ready within 24 hours.
The advantages of a container solution when you need a shielded space that can be moved to site without waiting for a building.
The door is the most common cause of lost performance in shielded rooms. We cover door types and why maintenance matters.
Planning the chamber size, absorber selection and test setup for the mandatory EMC tests of military and aerospace equipment.