Military equipment in the field works alongside other equipment, often under the influence of powerful transmitters and radars. A power supply that disturbs the radio, or a mission computer that resets after a radar pulse, is not just a technical problem but an operational risk. That is why MIL-STD-461 is the EMC standard most often encountered in defence projects, and the chamber in which its tests are carried out directly determines how reliable the results are.

In this article we explain what MIL-STD-461 requires from a test chamber, how chamber size and absorbers are chosen, how the test bench and measurement setup are planned together with the chamber, how shared use with aviation standards can be achieved and how to prepare the investment for the future.

What Does the Standard Require?

MIL-STD-461 defines test methods and limits for measuring the electromagnetic noise emitted by military equipment and subsystems and their immunity to the external electromagnetic environment. The tests fall into four groups: conducted emission (CE), conducted susceptibility (CS), radiated emission (RE) and radiated susceptibility (RS). The letters and numbers in front of each test, for example RE102 or RS103, show which group it belongs to and which method it uses.

MIL-STD-461G, the current version of the standard, requires most tests to be carried out in a shielded chamber with absorber-lined interior surfaces and a defined test bench layout. The first chamber requirement, related to both shielding and absorber performance, is that the background noise in the measurement environment is well below the limits. Which tests apply depends on the platform the equipment will be used on: ground vehicle, aircraft, ship or submarine.

How Is Chamber Size Determined?

The size of a MIL-STD-461 chamber depends on three main factors: the largest equipment to be tested, the dimensions of the test bench and the distance of the antennas from the test setup. The standard requires measurement antennas to be positioned 1 metre from the front of the test setup. Enough distance must also be left behind and beside the antennas to the absorbers, otherwise reflections will affect the results.

When heavy and large equipment is involved, chamber design becomes more complex. For vehicle-mounted systems, shelters or large electronic racks, wide doors, a reinforced floor and, where necessary, forklift or pallet truck access must be planned. Clarifying the range of products expected to be tested in the coming years before deciding the chamber dimensions reduces the need for later expansion.

Absorber Selection and Chamber Performance

MIL-STD-461G requires the absorbers used in the test chamber to meet a certain performance. Their job is to reduce reflections from the walls in radiated emission and radiated susceptibility tests, bringing the measurement closer to free space. The standard requires absorbers to suppress reflections to a certain level at frequencies above 80 MHz, and this performance must be documented with the absorber manufacturer's data.

Another point to consider in absorber selection is high-field susceptibility testing. In the RS103 test, fields of up to 200 volts per metre are generated for some platforms. Because these fields can heat the absorbers, their power handling capacity and fire-retardant properties must also be evaluated. We explain the differences between absorber types in our article on ferrite tiles and pyramid absorbers.

Test Bench and Measurement Setup

A significant part of MIL-STD-461 testing is done on a metal ground plane electrically bonded to the wall of the shielded chamber. This plane is usually made of copper or brass and must meet the minimum area and depth dimensions defined by the standard. The ground plane is bonded to the chamber with short, wide conductive straps at specified intervals.

The equipment is powered through line impedance stabilisation networks (LISNs) positioned on the test bench. The length of the cables, their distance from the bench edge and their height above the ground plane are set by the standard. Designing this layout together with the chamber ensures that the positions of filters, cable penetrations and control equipment are chosen correctly.

  • Copper or brass ground plane and bonding straps to the chamber
  • A LISN for each power line
  • Positioning area for measurement and susceptibility antennas
  • Filtered power inputs and fibre optic control penetrations

The Most Frequently Required Tests

The tests most often encountered in defence projects are CE102, RE102, CS114 and RS103. CE102 measures the noise the equipment feeds back onto its power lines between 10 kHz and 10 MHz. RE102 measures the electric field the equipment radiates from 10 kHz up to 18 GHz. CS114 tests immunity by injecting current onto cables. RS103 exposes the equipment to high-intensity electric fields.

Each of these tests asks something different of the chamber. RE102 needs low background noise and good absorber performance, RS103 needs space for high-power amplifiers and antennas, and CS114 needs a suitable cable layout and current probes. We explain these tests in detail in our article on MIL-STD-461G tests.

Shared Use with DO-160

The electromagnetic tests of RTCA DO-160, used for aviation equipment, particularly the RF susceptibility tests in Section 20 and the RF emission tests in Section 21, can be carried out in a chamber structure similar to MIL-STD-461. For organisations serving both the defence and aviation sectors, designing a chamber that meets both standards greatly increases the return on the investment.

For shared use, the chamber dimensions, absorber performance and equipment areas should be set according to the overlap of the requirements of the two standards. Small differences in test bench layouts and measurement distances can be handled with a flexible layout plan. We cover aviation tests in detail in our article on DO-160 Sections 20 and 21.

Control Room, Equipment and Future Planning

A MIL-STD-461 test facility does not consist only of the shielded test chamber. A control room containing measurement receivers, signal generators and control computers, a separate shielded area for high-power amplifiers and the cable penetrations between them must be planned together. Locating the amplifiers close to the test chamber reduces cable losses.

To prepare the investment for the future, a modular structure, an expandable floor layout and space left for additional amplifier capacity are recommended. New versions of the standard may bring new frequency ranges or new tests; a chamber flexible enough to adapt to these changes delivers serious savings in the long run. You can find our chamber options on our MIL-STD-461 test chamber page and our solutions for defence projects on our defence industry page.

Frequently Asked Questions

How long does it take to build a MIL-STD-461 chamber?

It varies with chamber size, absorber type and equipment scope. A detailed work schedule is prepared after the site survey and needs analysis.

Do you also supply the test equipment?

We design the chamber around your equipment list. Equipment supply can be planned together depending on the scope of the project.

Can the chamber be enlarged later?

Expansion can be planned thanks to the modular structure. Absorbers, floor and door must be chosen with this possibility in mind from the start.

Can MIL-STD-461 and DO-160 be done in the same chamber?

Yes. When chamber size, absorber performance and equipment layout are designed to the requirements of both standards, tests for both can be done in the same chamber.

How should the chamber be prepared for the RS103 test?

Enough space for high-power amplifiers and antennas, the power handling of the absorbers and safety measures to protect staff from high fields must all be planned together.

Why is the chamber background noise important?

In radiated and conducted emission measurements, ambient noise must be well below the limits. Otherwise the equipment's own emissions cannot be distinguished from ambient noise.

Let's Find the Right Solution for Your Project

Your free site survey and quote will be ready within 24 hours.

Get a Quote

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size