How to Write a Shielded Room Specification
Which values a shielded room specification for a tender or purchase must state, and the common mistakes to avoid, explained point by point.
A point-by-point list of what to check in advance in the area where a shielded room will be installed: floor, ceiling, power, ventilation and access.
Although shielded rooms are built from modular panels, the total weight shouldn't be underestimated. In anechoic chambers especially, absorbers, the turntable and test equipment put serious load on the floor. During the survey, the floor's load capacity per square meter and its flatness are checked.
If the floor slopes, gaps can form at panel joints, which means leakage. If needed, a level-adjustable base system is installed under the room or the screed is corrected.
The room's internal height, panel thickness and service space above the ceiling are calculated together. Ventilation ducts and cable trays usually need at least 40–50 cm of clearance above the room.
The route by which panels will be brought into the building also matters: door widths, lift capacity and stair turns should be measured in advance. Thanks to the modular design, panels can be made in sizes that pass through standard doors.
Since every power line entering the room passes through filters, the total power demand must be known from the start. Filters are selected by current rating, and their leakage current must be compatible with the building's electrical installation.
Penetrations with honeycomb filters are planned for ventilation and fiber optic lines for communications. Where these lines connect to the building's existing infrastructure is decided during the survey.
If there is a base station, transformer, lift motor or high-current cabling near the planned location, it is measured during the survey. The ambient signal level directly determines how much shielding the room must provide.
These measurements also show whether the dB value in the specification is realistic. During the free site survey we carry out all these checks and give you a written report.
Yes. Basements are often where outside signals are weaker; however, humidity and ventilation must be planned carefully.
It can, but work that creates dust and vibration in the room area should pause briefly during assembly.
For service and maintenance, leaving at least 50 cm of clearance around the room is usually recommended.
Your free site survey and quote will be ready within 24 hours.
Which values a shielded room specification for a tender or purchase must state, and the common mistakes to avoid, explained point by point.
Two shielded rooms may look the same and still be priced very differently. We explain the main cost factors one by one.
The advantages of a container solution when you need a shielded space that can be moved to site without waiting for a building.