What Is SVSWR? Chamber Validation Above 1 GHz
How the SVSWR measurement that shows a chamber is fit for radiated emission tests above 1 GHz is made, and what affects the result.
The field uniformity measurement that shows the field is spread evenly in front of the product in radiated immunity tests, and the 16-point grid method.
In the radiated immunity test, the strength of the electric field the device is exposed to directly determines the result. If one corner of the device is in a 10 V/m field and another in a 5 V/m field, the test has not really been carried out at the required level. So before testing starts, it must be shown that the field is sufficiently uniform in the area where the device will be placed.
The field uniformity measurement verifies that the chamber where the IEC 61000-4-3 test will be performed meets this condition. In this article we explain why a uniform field is needed, how the 16-point grid is measured, the acceptance criterion, how the data obtained are used for testing, the effect of the chamber and absorbers and when the measurement should be repeated.
The field produced by an antenna is not the same at every point inside the chamber. The antenna's radiation pattern, reflections from the chamber walls and floor and distance all make the field vary from point to point. When the device under test is placed in this varying field, different parts of the device are exposed to fields of different strength and the test result becomes dependent on the device's position.
For the test to be repeatable and comparable between laboratories, the field must be equal within a certain tolerance in the plane where the device is placed. IEC 61000-4-3 defines this plane as the uniform field area and requires measurement to show that the chamber can produce a sufficiently uniform field in it. This measurement is made before the test itself and is the basis of the test's validity. We cover the test in detail in our article on the IEC 61000-4-3 test.
The standard usually defines the uniform field area as a vertical plane 1.5 m x 1.5 m in size. The bottom edge of this plane is at a specified height above the floor, and the plane is located at the test distance from the antenna. A grid of 16 points spaced 50 cm apart is defined on the plane, and the field strength is measured at each of these points.
The measurement is made across the whole frequency range of the test, in defined steps and in both horizontal and vertical polarisation. At each frequency, the field values measured at the 16 points are compared. A smaller uniform field area can be defined for smaller products, but it must not be smaller than the minimum size set by the standard, and the product under test must stay within it.
The acceptance criterion for field uniformity is that, at each frequency, the field measured at most of the points stays within a certain range. According to the standard, at at least 12 of the 16 points, that is 75 percent, the field strength must be between 0 and +6 dB relative to the nominal value. This criterion is evaluated separately at each frequency.
This criterion allows the field to be lower or higher at some points in the uniform field area but limits the number of such points. Meeting the criterion shows the chamber is suitable for the radiated immunity test at that frequency. If there are frequencies where the criterion cannot be met, improvements to the absorbers, antenna position or chamber layout are needed at those frequencies.
The field uniformity measurement is not just a validation but also the calibration of the test. During the measurement, the power that must be supplied from the amplifier to produce the required field strength is recorded at each frequency. During the test, these power values are used to produce the required field strength in the area where the device is located.
For this reason the field uniformity measurement should be made with the antenna, cables, amplifier and antenna position that will be used in the test. If any of these components changes, the measurement may need to be repeated. It is also checked during the measurement that the amplifier does not saturate, that is that it can deliver the required power without distortion; this check ensures the peak values of the modulated signal are produced correctly.
The factors that most affect field uniformity are the chamber's absorber performance and geometry. Reflections from the walls and ceiling make the field vary from point to point in the uniform field area. Reflections from the floor are particularly important; this is why, in radiated immunity tests, the floor between the antenna and the test area is covered with absorbers.
The type of antenna, its distance from the uniform field area and its height also affect the result. Antennas with a wide radiation pattern illuminate the uniform field area more evenly. The chamber's dimensions determine how strong reflections will be. Field uniformity problems usually concentrate in certain frequency ranges and at certain points; this information helps find the source of the problem. For chamber options, see our semi-anechoic chamber page.
Radiated immunity tests are usually carried out in the semi-anechoic chamber also used for emission tests. The floor of these chambers is metal and reflective; for the immunity test, absorbers are placed on the floor between the antenna and the test area. The position, number and arrangement of these absorbers directly affect the field uniformity measurement.
This is why the floor absorbers must be placed the same way in every test, in the arrangement used for the field uniformity measurement. Marking absorber positions on the floor and documenting the layout with photographs ensures repeatability of the measurement and the tests. Any change to the layout may require the field uniformity measurement to be repeated.
The field uniformity measurement is made when the chamber is first commissioned and then repeated at set intervals. Accredited laboratories define this interval in their quality system; many laboratories measure once a year. The measurement should also be repeated when a significant change is made to the chamber, absorbers, antenna, antenna position or measurement system.
For laboratories wanting to carry out the measurement with their own staff, calibrated field probes and suitable software are enough. But making the measurement in line with the standard and evaluating results correctly requires experience. When a large uniform field area is needed for large products, bigger chambers such as a SAC-5 are preferred.
Yes. If the product fits within a smaller area, a smaller uniform field area can be defined, provided it does not go below the minimum size set by the standard.
Across the whole frequency range of the test, in the steps defined by the standard and in both polarisations.
It can be done with calibrated field probes and suitable software. But measuring in line with the standard and evaluating correctly requires experience.
At each frequency, the field strength at at least 12 of the 16 points must be between 0 and +6 dB relative to the nominal value.
At set intervals and when a significant change is made to the chamber, absorbers, antenna or measurement system.
They suppress reflections from the floor so the field is more even in the uniform field area. They must be placed in the validated arrangement in every test.
Your free site survey and quote will be ready within 24 hours.
How the SVSWR measurement that shows a chamber is fit for radiated emission tests above 1 GHz is made, and what affects the result.
How reverberation chambers deliberately multiply reflections instead of absorbing them, which tests use them and how they differ from anechoic chambers.
We compare the semi-anechoic chamber, with its reflective floor, and the fully anechoic chamber, with absorbers on every surface, and where each is used.