Semi-Anechoic EMC Chamber
SAC-3, SAC-5 and SAC-10 chambers
- Ferrite and hybrid absorber removal
- Flush turntable and ground plane
- Field uniformity calibration
We dismantle your semi-anechoic, fully anechoic or antenna measurement chamber, move it to your new facility, rebuild it, and prove with measurements that it performs just as it did before the move.
What makes an anechoic chamber valuable isn't just its shield. The absorber layout, a turntable that sits flush with the ground plane and a validated test site matter just as much, and a careless move can undo all three.
Pyramidal absorbers crush easily and ferrite tiles crack. A flush-mounted turntable needs a properly prepared pit at the new site. And if panel joints and door gaskets aren't brought back to their original tightness, shielding effectiveness drops.
So we run a relocation as a reinstallation project, not a haulage job. We measure the chamber before it moves, document every part as it comes down, rebuild it at the new site and repeat the same measurements. You end up with a side-by-side report you can put straight into your accreditation file.
Current performance is recorded.
Every absorber position is documented.
Turntable, mast and door are re-set.
NSA, SVSWR and shielding re-tested.
Every chamber type has its own critical points in a move. We build the plan around your chamber and the conditions at the new site.
SAC-3, SAC-5 and SAC-10 chambers
OTA and broadband measurement rooms
Far-field, near-field and compact range
Chambers with ground-plane test benches
An antenna measurement range is only as good as its alignment. The compact-range reflector, near-field scanner and positioner all have to return to the same geometry at the new site; otherwise the patterns you measure will no longer match your reference data.
We crate reflectors so nothing ever touches the surface and remove phase-stable RF cables without exceeding their bend radius. At the new site we re-level and re-align positioners and scanners, then check the quiet zone and the full measurement chain with a standard gain horn before the range goes back into service.
Crated so the surface is never touched.
Planarity re-set at the new site.
Axes re-aligned, reference points re-taken.
Removed and shipped within their bend radius.
Reflectivity measured again.
System verified with a standard gain horn.
We inspect both sites and record current performance.
Turntable pit, floor, power and HVAC are made ready.
Parts are numbered and photographed as they come down.
Fragile parts travel in purpose-built packaging.
Gaskets and damaged absorbers are replaced.
Baseline tests are repeated and reported.
For a lab testing under ISO/IEC 17025, moving a chamber is more than a physical job. The existing site validation no longer applies at the new location, and the chamber must be validated again before accredited testing can resume.
We plan the move around your accreditation calendar. We repeat the baseline measurements at the same points with the same method and give you a report that sets the results side by side, so you have the evidence your accreditation body will ask for.
Before and after results in one table.
Results are directly comparable.
Traceable calibration certificates.
Scheduled around your test calendar.
Scope depends on your chamber type and the condition of the new site. We confirm it in writing in the quote after the site survey.
Industries where it is used
| Scope | Teardown, packing, transport, rebuild |
|---|---|
| Chamber types | SAC, FAR, antenna and OTA chambers |
| Testing | Shielding, NSA, SVSWR, field uniformity |
| Renewal | Gaskets, damaged absorbers, filters |
| Documentation | Side-by-side before and after report |
| Coverage | Worldwide, customs included |
If your question isn't answered here, ask our engineer directly.
Yes. During the survey we inspect the panel system, absorber type and equipment, then report on whether the chamber can be moved and which parts will need renewing.
Sound absorbers are reused. Because some ferrite tiles crack during removal and older foam absorbers deteriorate over time, we identify which ones need replacing during the survey.
Yes. A move changes the chamber's geometry and ground-plane bonding. The chamber shouldn't be used as a test site until NSA, SVSWR and shielding measurements have been repeated.
With modular chambers, yes. A size change affects absorber layout and validation results, so we model it at the design stage.
It depends on the chamber size, distance and how ready the new site is. After the survey we provide a schedule covering teardown, transport, rebuild and testing.
Yes, and it's the ideal time to do it. Absorber renewal, frequency range extension or new penetrations can all be planned alongside the move.
Yes. We plan packing, shipping and customs, and our own team carries out the rebuild and validation in the new country.
Tell us what type of chamber you have and where it's going; your survey and quote will be ready within 24 hours.