6 Common Reasons Products Fail EMC Tests and How to Fix Them
The points where electronic products most often fail EMC certification, and simple measures you can take at the design stage, from an engineer's view.
The EMC standards electric vehicle chargers must meet, the challenges of high-power testing and the test chamber requirements.
Chargers convert tens or even hundreds of kilowatts with high-frequency power electronics. The switching noise generated in this conversion travels both to the grid side and onto the vehicle cable.
At the same time, chargers operate close to radio transmitters and other electrical equipment, in car parks and along roads. Both the noise they emit and their immunity to outside disturbances are critical.
In Europe, EMC requirements for chargers are defined by IEC 61851-21-2. This standard sets emission and immunity tests according to the charger's environment and power. On-board chargers on the vehicle side are assessed under automotive standards such as CISPR 25.
Tests must be run with the charger under real load, charging a vehicle or vehicle simulator. The noise of an idling charger doesn't reflect its behavior at full power.
Running a high-power charger in a test chamber requires a strong, filtered power entry into the room, a battery simulator to absorb the load and cooling for equipment that heats up. All these components must be integrated without compromising the room's shielding.
Load equipment is usually kept outside the chamber, with power brought in through high-current filters. Filters are selected by both current rating and leakage current limits.
Wall-mounted chargers can be tested in a compact semi-anechoic chamber, while floor-standing fast chargers and tests with a vehicle require large chambers such as a SAC-10.
By reviewing your product range and test plan together, we define the chamber size, power entry and filter capacity. You'll find EV-focused options in our automotive sector solutions.
It's set by the highest-power charger to be tested. Filter and cable sizes are chosen to match.
Yes. With a vehicle simulator or battery emulator, the charger can run under real load.
Often yes, by increasing the power entry and filter capacity; the existing infrastructure is inspected during the survey.
Your free site survey and quote will be ready within 24 hours.
The points where electronic products most often fail EMC certification, and simple measures you can take at the design stage, from an engineer's view.
The setup, levels and chamber requirements of IEC 61000-4-3, the test that measures a device's immunity to radio transmitters and mobile phones.
How electrostatic discharge testing works, the difference between contact and air discharge, test levels and where products most often fail.