MIL-STD-461G Tests: What CE102, RE102 and RS103 Mean
The naming logic of the MIL-STD-461G tests that military equipment must pass, and the most requested CE102, RE102 and RS103 tests, in plain language.
The TEMPEST zoning approach, which classifies the area where equipment sits by its distance to a possible outside listening point in classified facilities.
When TEMPEST protection comes up, people usually think of shielded rooms with thick metal walls. Yet the first and often most economical layer of protection is the distance between where classified information is processed and a potential eavesdropper. A room deep inside a building can provide a degree of protection without additional shielding, thanks to the natural attenuation of outer walls, floors and other structures in between.
TEMPEST zoning is the method of measuring this natural protection and matching it with the equipment to be used. In this article we explain the logic of zoning, how zones are matched with equipment levels, how a zone measurement is made, how a shielded room is used to raise a zone and how zoning is reflected in the facility plan.
Unintended emissions from electronic equipment weaken with distance from the source. Walls, floors, metal structures and other building elements in between also contribute to this attenuation. For an attacker to capture these signals, they must be able to reach a point where the signal is above a certain level. This point is usually an area outside the building, an adjoining building or an uncontrolled common area.
Zoning is based on measuring the total attenuation between the area where classified information is processed and the nearest point an attacker could reach. If this attenuation is large enough, higher-emission equipment can be used inside the area. If it is small, either lower-emission equipment must be used or additional protection provided. This approach makes it possible to balance protection to the need rather than shielding every area.
Within the NATO framework, zoning is defined in the SDIP-28 document. Areas are divided into zones, generally numbered from 0 to 3, according to the measured attenuation. Zone 0 refers to areas providing the least protection against the outside, and higher-numbered zones to areas providing more protection.
The equipment level that can be used in each zone is matched with the levels defined in SDIP-27. In the least protected zones, only equipment meeting the strictest level, level A, can be used. In more protected zones, level B or C equipment is allowed. We explain the levels in detail in our article on SDIP-27 levels.
In a zone measurement, a transmitter is placed in the area where classified information will be processed, emitting a known signal over a wide frequency range. The level of this signal is then measured with a receiver at uncontrolled points outside the area, such as around the building, in adjoining buildings or in shared corridors. The difference between the measured level and the reference level shows the attenuation the area provides.
The measurement is made in different directions and on different floors of the building, because an area's attenuation can vary with direction. A facade with windows can provide much less attenuation than a thick concrete wall. The results are evaluated according to the area's weakest direction, and a zone number is assigned accordingly.
Zoning is an important tool in planning a facility. Placing areas that will process classified information deep inside the building, away from outer facades and uncontrolled areas, increases natural attenuation. This reduces the need for additional shielding and lowers costs. It is therefore recommended to make the zoning measurement before the facility plan is finalised.
When designing a new building, the location of areas for classified processing, their distance from uncontrolled areas and the building elements in between can be planned according to zoning requirements. In an existing building, a zoning measurement shows which rooms are suitable as they are and which need additional protection.
If an area's natural attenuation is insufficient and lower-emission equipment cannot be used, the area can be shielded to raise its zone. A shielded room adds its own shielding value to the natural attenuation and so increases the total attenuation. The area then moves to a higher-numbered zone, and higher-emission, that is more economical commercial equipment can be used inside it.
This approach offers an economical solution especially in areas where many devices will be used. Rather than buying every device TEMPEST certified, shielding the area and using standard equipment can lower total cost. All lines entering the shielded room must also be fitted with suitable filters; otherwise signals will leak out through these lines. For options, see our TEMPEST room page.
An area's zone can change with changes made to the building. Demolishing a wall, opening a new window, changing the use of adjoining areas or a previously controlled area becoming uncontrolled can reduce the area's attenuation. Similarly, new cable or pipe penetrations can create new paths for signals to leak out.
Zoning is therefore not something done once and forgotten. Zone measurements should be repeated when significant changes are made to the building and at intervals set by the competent authorities. In shielded rooms, periodic shielding measurements verify that the additional protection the room provides is still in place.
Zoning measurements are made by organisations authorised by national security authorities or by these authorities' own experts. Measurement results and zone determinations are usually treated as classified information and shared only with authorised persons.
The organisation planning or using the facility should work closely with the competent authorities during the zoning process. Companies providing shielding solutions support the design and installation of shielded rooms that meet the determined zone requirements. You can explore the basics in our article what is TEMPEST and our solutions for defence projects on our defence industry page.
They are made by organisations authorised by national security authorities or by these authorities' experts.
No. If the zone measurement shows sufficient natural attenuation and equipment of a suitable level is used, additional shielding may not be needed.
Yes. Changes to the building, new openings or changes in the use of surrounding areas can affect the zone; measurements are therefore repeated periodically.
It expresses the attenuation the area provides against the outside. Higher-numbered zones provide more protection and allow higher-emission equipment to be used.
A shielded room adds its own shielding value to the natural attenuation, increasing total attenuation and moving the area into a higher zone.
It is recommended before the facility plan is finalised and while the areas for classified processing are being decided.
Related Solutions
Your free site survey and quote will be ready within 24 hours.
The naming logic of the MIL-STD-461G tests that military equipment must pass, and the most requested CE102, RE102 and RS103 tests, in plain language.
Planning the chamber size, absorber selection and test setup for the mandatory EMC tests of military and aerospace equipment.
How strong electromagnetic pulses affect electronic systems and how critical facilities are protected.