Guide

Shielded Room Maintenance Schedule: Daily, Monthly and Annual Checks

The checks users and maintenance teams should do regularly to keep your shielded room's performance for years, organized as a schedule.

A shielded room does not keep the performance measured on the day it was installed by itself. The door is opened and closed dozens of times a day, gaskets wear and get dirty, connections loosen, filters age and over time new cables and equipment are added to the room. Each of these changes can reduce the room's shielding performance in ways that cannot be seen.

Regular maintenance keeps a shielded room close to its day-one performance for years. In this article we explain why regular maintenance is needed, the checks to be done daily, weekly, monthly and annually, how to keep a maintenance log and which parts of maintenance should be done by the organisation's own staff and which by a specialist team.

Why Regular Maintenance?

The performance of a shielded room is as good as its weakest point. This weak point is often the door, filter connections or a penetration opened later. Deterioration at these points is usually gradual: a gasket section bends, a screw loosens, a filter connection oxidises. Each may look like a small change, but together they can significantly reduce the room's performance.

A drop in performance has different consequences depending on the room's purpose. In an EMC test chamber, the reliability of measurements falls; in a digital forensics room, evidence is put at risk; and in a security room, a risk of information leakage appears. Regular maintenance is the most economical way to prevent these risks before they appear, and it noticeably extends the room's life.

Daily and Weekly Checks

Daily checks are simple observations that the staff using the room can easily make. They check that the door closes and locks fully, that there is no visible damage around the door and that there are no bent or broken parts in the door gaskets. If any difficulty or change in closing the door is noticed, it should be recorded immediately.

In weekly checks, door gaskets and contact surfaces are cleaned. Dust and dirt reduce the contact quality of gaskets, so cleaning should be done with a soft brush and a suitable cleaner. Inside and around the room, any new cables, holes or changes that could affect the shielding are also reviewed.

  • Daily: door closes fully, no visible damage to gaskets
  • Weekly: cleaning of gaskets and contact surfaces
  • Weekly: check for new cables, holes or changes

Monthly Checks

Monthly checks require a more detailed inspection and should be done by trained staff. Door hinges and the locking mechanism are checked, and it is verified that the door seats properly in the frame and that the gaskets are compressed evenly at every point. Hinge and lock adjustments are made if needed.

Dust filters in front of the honeycomb ventilation filters are cleaned or replaced. Connections on the filter panel, cable penetrations and the earth connection are checked visually for loose screws, oxidation or signs of damage. Any problems with the room's interior fit-out, lighting, sockets and air-conditioning system are also checked. We explain honeycomb filter maintenance in our article on the honeycomb ventilation filter.

Annual Checks and Measurement

The most important part of annual maintenance is measuring the room's shielding performance. The measurement is made with the method and at the points used during installation and compared with previous results. This comparison clearly shows whether there has been a drop in performance and where. The results are added to the maintenance log and, if necessary, to the quality system.

In annual maintenance, the condition of door gaskets is also examined in detail and replaced if necessary. Connections and insulation of power line filters are checked, the surfaces of honeycomb filters are cleaned and frame gaskets examined. Panel joints and the earthing system are also reviewed. For information on our measurement service, see our shielding measurement page.

After Changes

In addition to periodic maintenance, extra checks and measurements should be made whenever a significant change is made to the room. Opening a new cable penetration, replacing a filter, repairing the door or moving the room are changes that can directly affect performance. After these changes, a check measurement should be made at least at the point where the change was made.

Care is also needed when bringing new equipment into the room. The equipment's cables must be connected through the room's filtered penetrations, and no new hole should be made in the room's wall. Explaining these rules clearly to all staff using the room and defining them in a written procedure prevents unintentional changes that reduce performance.

Who Should Do the Maintenance?

Daily and weekly checks can easily be done by the staff using the room. For this, staff need only a short training and a simple checklist. Monthly checks can usually be done by the organisation's technical staff, following the instructions provided by the company that installed the room.

The annual measurement and comprehensive maintenance should be carried out by a team with measurement equipment and expertise. This team may be the company that installed the room or another specialist firm. What matters is that the measurement is made with a consistent method and the results are comparable with previous measurements. For our maintenance and modification service, see our maintenance and modification page.

Keep a Maintenance Log

Every check, cleaning, repair and measurement should be entered in a maintenance log with the date and the person who did it. This log makes it possible to track how the room's performance changes over time, identify recurring problems and improve the maintenance plan. For example, if the same door gasket needs frequent replacement, this may indicate a problem with the door adjustment or the way it is used.

The maintenance log is also an important document in warranty processes, accreditation audits and security reviews. Keeping the log simple and accessible makes it easier to maintain regularly. A check card hung next to the door and a digital maintenance book are a sufficient start for most organisations. You can find details on door gasket maintenance in our article on shielded door selection.

Frequently Asked Questions

Can our own team do the maintenance?

Most daily, weekly and monthly checks can be done by trained staff. The annual measurement and comprehensive maintenance need a specialist team with measurement equipment.

Do you maintain rooms installed by other companies?

Yes. The condition of the existing room is examined, a measurement is made and a maintenance plan suited to the room's structure is prepared.

Can the room not be used during maintenance?

Daily and weekly checks do not affect use. The annual measurement and comprehensive maintenance usually take the room out of use for one to a few days.

How often are door gaskets replaced?

It depends on usage. On heavily used doors gaskets are renewed every few years; damaged parts should be replaced as soon as they are noticed.

Is measurement needed every year?

Most organisations measure once a year. This can be more frequent depending on accreditation requirements, security conditions or usage.

What should the maintenance log include?

The date of every check, cleaning, repair and measurement, the person who did it, problems found and actions taken should be recorded.

Let's Find the Right Solution for Your Project

Your free site survey and quote will be ready within 24 hours.

Get a Quote

Get a Quote

Step 1 / 2 · Your Project

What kind of room do you need?
Approximate size