How to Prepare an EMC Test Plan Before Going to the Lab
What an EMC test plan should contain before you go to the certification lab: standards, operating modes and performance criteria.
The chamber, equipment and validation steps for organizations that want to set up their own EMC lab and gain ISO/IEC 17025 accreditation.
For manufacturers who constantly have their products tested in external laboratories, setting up their own accredited EMC laboratory becomes an attractive option at some point. Instead of waiting for test slots, sending engineers to tests and paying retest fees after every design change, they can carry out tests at their own facilities on their own schedule. Some organisations also aim to offer testing services to external customers.
In this article we explain the advantages of setting up your own accredited laboratory, what accreditation expects from infrastructure, test chamber selection and validation, equipment and measurement traceability, the process from installation to accreditation and what to watch for on this journey.
The biggest advantage of having your own accredited laboratory is full control over the test process. Tests can be planned around the product development schedule, and when a problem arises the product can go straight back to the design team. This shortens time to market and improves the efficiency of development.
An accredited laboratory can issue its own test reports, and these reports are accepted by regulators and customers. For organisations wanting to offer testing services to external customers, accreditation is the foundation of the business model. But setting up a laboratory and maintaining accreditation require significant investment and continuous effort, so the decision should be made considering test volume and long-term plans.
Test laboratories are accredited to ISO/IEC 17025. This standard covers the laboratory's management system, staff competence, validity of methods, equipment calibration and suitability of the working environment. In Turkey, accreditation is carried out by the national accreditation body, and thanks to international mutual recognition arrangements, accredited reports are also accepted abroad.
In terms of infrastructure, the most important requirements are that test chambers are validated to the relevant standards, that the calibration of measurement equipment is traceable and that measurement uncertainties are calculated. The laboratory must also regularly demonstrate the reliability of its measurements by taking part in proficiency tests and interlaboratory comparisons.
At the heart of an accredited EMC laboratory there is usually a semi-anechoic chamber. Its size is chosen according to the size of products to be tested and the measurement distance required by the applicable standards. A 3 m chamber may be enough for small and medium products, while large products and some standards may need 10 m chambers.
For accreditation, the chamber must be validated to the relevant standards. For radiated emission measurements, NSA below 1 GHz and SVSWR above 1 GHz are measured; for radiated immunity tests, field uniformity is measured. The results show that the chamber meets the relevant tolerances and are part of the accreditation file. We discuss validation measurements in our article on NSA and SVSWR measurements.
An EMC laboratory's measurement equipment consists of EMI receivers, antennas, LISNs, preamplifiers, cables, signal generators, power amplifiers, field probes and immunity test equipment. The calibration of each must be traceable to national or international measurement standards. Calibration intervals are defined in the laboratory's quality system.
Measurement uncertainty is one of the fundamental elements of accreditation. The laboratory must calculate the measurement uncertainty for each test method, taking into account the contributions of equipment, chamber and test setup. How this calculation is done for emission measurements is defined in the relevant CISPR standards. Uncertainty values are also stated in test reports.
An EMC laboratory does not consist only of the test chamber. A shielded control room housing measurement instruments and control computers, a separate area for high-power amplifiers, sample preparation and storage areas, and shielded rooms or test benches for conducted tests are other important parts of the laboratory.
The relative positions of these areas directly affect cable lengths, workflow and the laboratory's efficiency. For example, locating the amplifiers close to the test chamber reduces cable losses. Wide corridors and suitable doors should be planned so samples can be moved easily to the test chamber. We explain control room design in our article on EMC control room design.
The journey from installation to accreditation usually consists of several stages. In the first stage the test chamber and infrastructure are installed and chamber validation measurements made. Then equipment is procured, calibrated and the measurement system set up. During this process laboratory staff are trained and methods validated.
In the next stage the quality system is established; procedures, forms and record systems are prepared. The laboratory works with this system for a while, accumulating records and taking part in proficiency tests. Finally the accreditation application is made, and accreditation is granted after the assessment. Depending on the laboratory's readiness, this process usually takes a year or more.
Many organisations follow a step-by-step path rather than going straight to an accredited laboratory. In the first stage a pre-compliance chamber is built and used for in-house tests. At this stage staff gain experience, test processes settle and the laboratory's real test volume becomes clear. If designed correctly from the start, the pre-compliance chamber can also be used for accredited measurements later.
This approach spreads the investment over time and reduces risk. But if a pre-compliance chamber is to be upgraded for accreditation later, its size, absorber performance and validation requirements must be set for this goal from the start. For large-scale options see our SAC-10 page, and for compact options our SAC-3 page. For other chamber types, see our semi-anechoic chamber page.
Depending on the laboratory's readiness, it usually takes a year or more from installation to accreditation.
Yes, if it was designed from the start with the right size and absorber performance to meet validation requirements.
Yes. New test methods and standards can be added to the scope once the necessary infrastructure and validations are complete.
It depends on the size of products to be tested and the measurement distance of the applicable standards. A 3 m chamber may suit small products and a 10 m chamber large ones.
It is one of the fundamental elements of accreditation. The laboratory must calculate the uncertainty for each method and state it in reports.
Tests in which the laboratory measures the same sample as other laboratories and compares results. They regularly demonstrate the reliability of measurements.
Your free site survey and quote will be ready within 24 hours.
What an EMC test plan should contain before you go to the certification lab: standards, operating modes and performance criteria.
How switching power supplies, the biggest source of EMC problems in electronic products, generate noise and what to do about it in design.
Rules for ground planes, layout, filtering and connectors that prevent EMC problems at the source when designing printed circuit boards.